Company
Greetings
History
Vision
Introduction to technicians
Certification and patents
Facility·equipment status
Introduction to Branches
Technique Development
Low temperature pyrolysis
Cyclonic Combustor (Cyclone)
Water Tube Boiler
Constructing Boiler
Waste Heat Boiler (Incineration Boilor)
Wood Chip Boiler
Pellet Boiler
NHH-High Temperature Water Boiler
Gas Combustion Boiler
Combined Heat and Power boiler
Deaerator
Steam accumulator
Heat Recovery System
Construction Performance
Domestic
Oversea
E-PR Office
News
Brochure
Promotional video
C/S Center
Notice
Online Quotation & contact
ENG
ENG
KOR
JPN
VNM
CHN
Product
Construction Performance (Domestic)
Company
Technique Development
Construction Performance
E-PR Office
C/S Center
Construction Performance (Domestic)
01
Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
Started
2018.11.21
Completed
2020.03.01
Capacity
18.5T/HR
Pressure
Pressure 30kg/㎠
Location
Gwangju
02
Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
Started
2018.12.21
Completed
2019.12.17
Capacity
53.9T/HR
Pressure
1.4Mpa
Location
Sejong
03
Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
Started
2013.09
Completed
2014.01
Capacity
15,000Kg/HR
Pressure
20kg/㎠
Location
Pyeogtaek Poseung
04
Anytech (WASTE HEAT BOILER)
Started
2018.08.21
Completed
2019.10
Capacity
21.6T/H
Pressure
2.5Mpa
Location
Anytech factory in Yangju
납품실적(국내) 목록
CUSTOMER
YEAR
CAPACITY
(Kg/HR)
LOCATION
PRESSURE
TYPE
REMARK
SEHA
2011. 08
40,000Kg/HR
HYENPUNG
10kg/㎠
WATER TUBE BOILER
TUBE REVAMPING
ECO SERVICE KOREA
2011.08
30,000Kg/HR
SIWHA
20㎏/㎠
WASTE HEAT BOILER (ECONOMIZER)
LG CHEMICAL
2011.05
20,000Kg/HR
DAESAN
-
WATER TUBE BOILER
DSC SYSTEM
SUN WOOD
2011.05
45,000Kg/HR
INCHEON
40㎏/㎠
WATER TUBE BOILER
TUBE REVAMPING
KOLON
2011.05
5,000Kg/HR
GIMCHEON
10kg/㎠
SMOKE TUBE BOILER
HITE JINRO
2011.03
30,000Kg/HR
MASAN
30kg/㎠
WATER TUBE BOILER
GREENSCO
2011. 01
18,000Kg/HR
INCHEON
10kg/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
TUBE REVAMPING
DAEDONG ENG
2011. 01
2,000Kg/HR
INCHEON
10kg/㎠
SMOKE TUBE BOILER (WASTE HEAT BOILER)
HITE BEER
2010. 07
40,000Kg/HR
GANGWON
20kg/㎠
ECONOMIZER
DAEDONG ENG
2010. 12
1,000Kg/HR
INCHEON
10kg/㎠
SMOKE TUBE BOILER
TAE YANG B&TEC
2010. 11
3,000Kg/HR
YESU
10kg/㎠
SMOKE TUBE BOILER
DONGYANG BOILER IND
2010. 11
4,000Kg/HR
HYENPUNG
10kg/㎠
SMOKE TUBE BOILER
SEHA
2010. 11
30,000Kg/HR
HYENPUNG
15kg/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
TUBE REVAMPING
SEDAI ENERGY & TECHNOLOGY
2010. 08
8,000Kg/HR
PAJU
10kg/㎠
SMOKE TUBE BOILER (WASTE HEAT BOILER)
TUBE REVAMPING
HITE BEER
2010. 07
5,000Kg/HR
GANGWON
10kg/㎠
SMOKE TUBE BOILER
TUBE REVAMPING
처음
1
페이지
2
페이지
3
페이지
4
페이지
5
페이지
6
페이지
7
페이지
8
페이지
열린
9
페이지
10
페이지
다음
맨끝
게시물 검색
검색대상
CUSTOMER
YEAR
검색어
필수
검색
검색