ENG
Product
Construction Performance (Domestic)
  • 01
    Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
    • Started2018.11.21
    • Completed2020.03.01
    • Capacity18.5T/HR
    • PressurePressure 30kg/㎠
    • LocationGwangju
  • 02
    Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
    • Started2018.12.21
    • Completed2019.12.17
    • Capacity53.9T/HR
    • Pressure1.4Mpa
    • LocationSejong
  • 03
    Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
    • Started2013.09
    • Completed2014.01
    • Capacity15,000Kg/HR
    • Pressure20kg/㎠
    • LocationPyeogtaek Poseung
  • 04
    Anytech (WASTE HEAT BOILER)
    • Started2018.08.21
    • Completed2019.10
    • Capacity21.6T/H
    • Pressure2.5Mpa
    • LocationAnytech factory in Yangju
납품실적(국내) 목록
CUSTOMER YEAR CAPACITY (Kg/HR) LOCATION PRESSURE TYPE REMARK
SEHA 2011. 08 40,000Kg/HR HYENPUNG 10kg/㎠ WATER TUBE BOILER TUBE REVAMPING
ECO SERVICE KOREA 2011.08 30,000Kg/HR SIWHA 20㎏/㎠ WASTE HEAT BOILER (ECONOMIZER)
LG CHEMICAL 2011.05 20,000Kg/HR DAESAN - WATER TUBE BOILER DSC SYSTEM
SUN WOOD 2011.05 45,000Kg/HR INCHEON 40㎏/㎠ WATER TUBE BOILER TUBE REVAMPING
KOLON 2011.05 5,000Kg/HR GIMCHEON 10kg/㎠ SMOKE TUBE BOILER
HITE JINRO 2011.03 30,000Kg/HR MASAN 30kg/㎠ WATER TUBE BOILER
GREENSCO 2011. 01 18,000Kg/HR INCHEON 10kg/㎠ WATER TUBE BOILER (WASTE HEAT BOILER) TUBE REVAMPING
DAEDONG ENG 2011. 01 2,000Kg/HR INCHEON 10kg/㎠ SMOKE TUBE BOILER (WASTE HEAT BOILER)
HITE BEER 2010. 07 40,000Kg/HR GANGWON 20kg/㎠ ECONOMIZER
DAEDONG ENG 2010. 12 1,000Kg/HR INCHEON 10kg/㎠ SMOKE TUBE BOILER
TAE YANG B&TEC 2010. 11 3,000Kg/HR YESU 10kg/㎠ SMOKE TUBE BOILER
DONGYANG BOILER IND 2010. 11 4,000Kg/HR HYENPUNG 10kg/㎠ SMOKE TUBE BOILER
SEHA 2010. 11 30,000Kg/HR HYENPUNG 15kg/㎠ WATER TUBE BOILER (WASTE HEAT BOILER) TUBE REVAMPING
SEDAI ENERGY & TECHNOLOGY 2010. 08 8,000Kg/HR PAJU 10kg/㎠ SMOKE TUBE BOILER (WASTE HEAT BOILER) TUBE REVAMPING
HITE BEER 2010. 07 5,000Kg/HR GANGWON 10kg/㎠ SMOKE TUBE BOILER TUBE REVAMPING