ENG
Product
Construction Performance (Domestic)
  • 01
    Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
    • Started2018.11.21
    • Completed2020.03.01
    • Capacity18.5T/HR
    • PressurePressure 30kg/㎠
    • LocationGwangju
  • 02
    Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
    • Started2018.12.21
    • Completed2019.12.17
    • Capacity53.9T/HR
    • Pressure1.4Mpa
    • LocationSejong
  • 03
    Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
    • Started2013.09
    • Completed2014.01
    • Capacity15,000Kg/HR
    • Pressure20kg/㎠
    • LocationPyeogtaek Poseung
  • 04
    Anytech (WASTE HEAT BOILER)
    • Started2018.08.21
    • Completed2019.10
    • Capacity21.6T/H
    • Pressure2.5Mpa
    • LocationAnytech factory in Yangju
납품실적(국내) 목록
CUSTOMER YEAR CAPACITY (Kg/HR) LOCATION PRESSURE TYPE REMARK
ASIA PAPER 2014. 09 46,000Kg/HR CHEONGWON 20kg/㎠ FURNACE SIDE WALL PANEL
SEOUL MILK 2014. 09 10,000Kg/HR YANGJU 20kg/㎠ WATER TUBE BOILER (TUBE REVAMPING)
DANA ENERGY 2014.09 - CHEONGWON - STEAM PIPING
DONGSUH FOOD 2014.09 10,000Kg/HR CHANGWON 20kg/㎠ REFRACTORY REVAMPING
HITE JINRO 2013. 08 25,000Kg/HR JEONJU 10kg/㎠ WATER TUBE BOILER
HEE JEONG I&C 2014.08 10,000Kg/HR SEJEONG 16㎏/㎠ WATER TUBE BOILER (WASTE HEAT BOILER) 3-DRUM
COSMO 2012.03 25,000Kg/HR INCHEON 10kg/㎠ WATER TUBE BOILER
W.MSCIENCE&TECHNOLOGY 2012.03 8,000Kg/HR GIMPO 10kg/㎠ SMOKE TUBE BOILER BIO MASS
HITE JINRO 2012.02 30,000Kg/HR MASAN 10kg/㎠ WATER TUBE BOILER TUBE REVAMPING
JEONJU PAPER 2011.03 20,000Kg/HR CHEONGWON 10㎏/㎠ WATER TUBE BOILER TUBE REVAMPING
HITE JINRO 2011. 12 50,000Kg/HR GANGWON 30kg/㎠ WATER TUBE BOILER TUBE REVAMPING
BUPYEONG POLICE 2011.11 2,000Kg/HR BUPYEONG 10kg/㎠ SMOKE TUBE BOILER
KOREAENVIROMENTCORP. 2011. 09 20,000Kg/HR GUNSAN 10kg/㎠ WATER TUBE BOILER
DAE HAN PAPER 2011. 08 30,000Kg/HR CHEONGWON 10kg/㎠ WATER TUBE BOILER TUBE REVAMPING
UNID 2011. 08 - GUNSAN - HEAT EXCHANGER