Company
Greetings
History
Vision
Introduction to technicians
Certification and patents
Facility·equipment status
Introduction to Branches
Technique Development
Low temperature pyrolysis
Cyclonic Combustor (Cyclone)
Water Tube Boiler
Constructing Boiler
Waste Heat Boiler (Incineration Boilor)
Wood Chip Boiler
Pellet Boiler
NHH-High Temperature Water Boiler
Gas Combustion Boiler
Combined Heat and Power boiler
Deaerator
Steam accumulator
Heat Recovery System
Construction Performance
Domestic
Oversea
E-PR Office
News
Brochure
Promotional video
C/S Center
Notice
Online Quotation & contact
ENG
ENG
KOR
JPN
VNM
CHN
Product
Construction Performance (Domestic)
Company
Technique Development
Construction Performance
E-PR Office
C/S Center
Construction Performance (Domestic)
01
Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
Started
2018.11.21
Completed
2020.03.01
Capacity
18.5T/HR
Pressure
Pressure 30kg/㎠
Location
Gwangju
02
Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
Started
2018.12.21
Completed
2019.12.17
Capacity
53.9T/HR
Pressure
1.4Mpa
Location
Sejong
03
Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
Started
2013.09
Completed
2014.01
Capacity
15,000Kg/HR
Pressure
20kg/㎠
Location
Pyeogtaek Poseung
04
Anytech (WASTE HEAT BOILER)
Started
2018.08.21
Completed
2019.10
Capacity
21.6T/H
Pressure
2.5Mpa
Location
Anytech factory in Yangju
납품실적(국내) 목록
CUSTOMER
YEAR
CAPACITY
(Kg/HR)
LOCATION
PRESSURE
TYPE
REMARK
ASIA PAPER
2014. 09
46,000Kg/HR
CHEONGWON
20kg/㎠
FURNACE SIDE WALL PANEL
SEOUL MILK
2014. 09
10,000Kg/HR
YANGJU
20kg/㎠
WATER TUBE BOILER (TUBE REVAMPING)
DANA ENERGY
2014.09
-
CHEONGWON
-
STEAM PIPING
DONGSUH FOOD
2014.09
10,000Kg/HR
CHANGWON
20kg/㎠
REFRACTORY REVAMPING
HITE JINRO
2013. 08
25,000Kg/HR
JEONJU
10kg/㎠
WATER TUBE BOILER
HEE JEONG I&C
2014.08
10,000Kg/HR
SEJEONG
16㎏/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
3-DRUM
COSMO
2012.03
25,000Kg/HR
INCHEON
10kg/㎠
WATER TUBE BOILER
W.MSCIENCE&TECHNOLOGY
2012.03
8,000Kg/HR
GIMPO
10kg/㎠
SMOKE TUBE BOILER
BIO MASS
HITE JINRO
2012.02
30,000Kg/HR
MASAN
10kg/㎠
WATER TUBE BOILER
TUBE REVAMPING
JEONJU PAPER
2011.03
20,000Kg/HR
CHEONGWON
10㎏/㎠
WATER TUBE BOILER
TUBE REVAMPING
HITE JINRO
2011. 12
50,000Kg/HR
GANGWON
30kg/㎠
WATER TUBE BOILER
TUBE REVAMPING
BUPYEONG POLICE
2011.11
2,000Kg/HR
BUPYEONG
10kg/㎠
SMOKE TUBE BOILER
KOREAENVIROMENTCORP.
2011. 09
20,000Kg/HR
GUNSAN
10kg/㎠
WATER TUBE BOILER
DAE HAN PAPER
2011. 08
30,000Kg/HR
CHEONGWON
10kg/㎠
WATER TUBE BOILER
TUBE REVAMPING
UNID
2011. 08
-
GUNSAN
-
HEAT EXCHANGER
처음
1
페이지
2
페이지
3
페이지
4
페이지
5
페이지
6
페이지
7
페이지
열린
8
페이지
9
페이지
10
페이지
다음
맨끝
게시물 검색
검색대상
CUSTOMER
YEAR
검색어
필수
검색
검색