ENG
Product
Construction Performance (Domestic)
  • 01
    Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
    • Started2018.11.21
    • Completed2020.03.01
    • Capacity18.5T/HR
    • PressurePressure 30kg/㎠
    • LocationGwangju
  • 02
    Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
    • Started2018.12.21
    • Completed2019.12.17
    • Capacity53.9T/HR
    • Pressure1.4Mpa
    • LocationSejong
  • 03
    Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
    • Started2013.09
    • Completed2014.01
    • Capacity15,000Kg/HR
    • Pressure20kg/㎠
    • LocationPyeogtaek Poseung
  • 04
    Anytech (WASTE HEAT BOILER)
    • Started2018.08.21
    • Completed2019.10
    • Capacity21.6T/H
    • Pressure2.5Mpa
    • LocationAnytech factory in Yangju
납품실적(국내) 목록
CUSTOMER YEAR CAPACITY (Kg/HR) LOCATION PRESSURE TYPE REMARK
HITE JINRO 2015.06 30,000Kg/HR MASAN 25kg/㎠ WATER TUBE BOILER
SUNGPOONG CABLE 2015.05 1,000Kg/HR CHEONAN 25kg/㎠ WATER TUBE BOILER
DAELIM PAPER 2015.05 12,000Kg/HR OSAN 12kg/㎠ WASTE HEAT BOILER 1-DRUM
KOREA PAPER 2015.02 35,000Kg/HR ANSAN 10kg/㎠ INCINERATE BOILER WATER TUBE REPLACEMENT
YOUNGPOONG PAPER 2015.05 25,000Kg/HR OSAN 10kg/㎠ INCINERATE BOILER WATER TUBE REPLACEMENT
ASIA PAPER 2015.05 45,000 CHEONGWON 10kg/㎠ INCINERATE BOILER WATER TUBE REPLACEMENT
SUNWOOD 2015.03 25,000Kg/HR INCHEON 16kg/㎠ WOOD BOILER WATER TUBE REPLACEMENT
NEOGREEN TECH 2015. 03 3,000Kg/HR JAPAN 10kg/㎠ WOOD BOILER SMOKE TUBE TYPE CYLINDRICAL BOILER
DAEGYEONG TECH 2014.12 - SEOUL 10kg/㎠ HEAT EXCHANGER
SHIN DAE YANG PAPER 2014.12 - SIWHA - CAVITY
HEE JEONG I&C 2014.11 1,500Kg/HR YEOSU 20kg/㎠ WATER TUBE BOILER (WASTE HEAT BOILER)
TS ENG 2014. 10 - JEONJU - ECONOMIZER
NAMSAN MANSION MGT 2014. 09 3,000Kg/HR NAMSAN 10kg/㎠ WATER TUBE BOILER TUBE REVAMPING
SHIN DAE YANG PAPER 2014.09 35,000 SIWHA 12㎏/㎠ WATER TUBE BOILER (WASTE HEAT BOILER) TUBE REVAMPING
SHIN DAE YANG PAPER 2014.09 30,000Kg/HR BANWOL 12㎏/㎠ WATER TUBE BOILER (WASTE HEAT BOILER) TUBE REVAMPING