ENG
Product
Construction Performance (Domestic)
  • 01
    Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
    • Started2018.11.21
    • Completed2020.03.01
    • Capacity18.5T/HR
    • PressurePressure 30kg/㎠
    • LocationGwangju
  • 02
    Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
    • Started2018.12.21
    • Completed2019.12.17
    • Capacity53.9T/HR
    • Pressure1.4Mpa
    • LocationSejong
  • 03
    Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
    • Started2013.09
    • Completed2014.01
    • Capacity15,000Kg/HR
    • Pressure20kg/㎠
    • LocationPyeogtaek Poseung
  • 04
    Anytech (WASTE HEAT BOILER)
    • Started2018.08.21
    • Completed2019.10
    • Capacity21.6T/H
    • Pressure2.5Mpa
    • LocationAnytech factory in Yangju
납품실적(국내) 목록
CUSTOMER YEAR CAPACITY (Kg/HR) LOCATION PRESSURE TYPE REMARK
SUNGLIM OIL & CHEMICAL 2016.02 5,000Kg/HR ANSAN 12kg/㎠ HEAT EXCHANGER
CHODANG ENVIRONMENT 2016.02 16,700Kg/HR JEONNAM 12kg/㎠ VACUUM CAPACITOR 3-DRUM
SKC INFRASERVICE 2016.02 100,000Kg/HR ULSAN 44kg/㎠ SEPERATOR
SE HA CORP 2016.01 25,000Kg/HR HYEONPUNG 10kg/㎠ WATER TUBE BOILER WATER TUBE REPLACEMENT
MH ETHANOL 2016.01 18,000Kg/HR MASAN 30kg/㎠ WATER TUBE BOILER
WOOLIM INDUSTRY 2016.01 6,000Kg/HR YEOJU HEAT SUPPY BOILER BIOMASS
KGETS 2015.11 20,000Kg/HR SIWHA 20kg/㎠ WATER TUBE BOILER WATER TUBE REPLACEMENT
MONALISA 2015.11 20,000Kg/HR JEONJU 20kg/㎠ ECONOMIZER
CDS ENERGY(posco) 2015.10 15,000Kg/HR KOREA 47kg/㎠ WASTE HEAT 2-DRUM
SUNWOOD 2015.07 15,000Kg/HR INCHEON 16kg/㎠ WOOD BOILER
DONGWOO BIO 2015.08 5,000 YONGIN 10kg/㎠ WOOD PELLET BOILER
ASIA PAPER 2015.07 45,000Kg/HR SIHWA 20kg/㎠ CAVITY WATER TUBE REPLACEMENT
KITECH 2015.07 1,500Kg/HR JEONJU 10kg/㎠ STEAM BOILER
NEOGREEN TECH 2015.06 3,500Kg/HR DUNPO 7kg/㎠ WOOD BOILER
NATURE & PEOPLE 2015.06 10,000Kg/HR DAMYANG 14kg/㎠ SMOLE TUBE BOILER