Company
Greetings
History
Vision
Introduction to technicians
Certification and patents
Facility·equipment status
Introduction to Branches
Technique Development
Low temperature pyrolysis
Cyclonic Combustor (Cyclone)
Water Tube Boiler
Constructing Boiler
Waste Heat Boiler (Incineration Boilor)
Wood Chip Boiler
Pellet Boiler
NHH-High Temperature Water Boiler
Gas Combustion Boiler
Combined Heat and Power boiler
Deaerator
Steam accumulator
Heat Recovery System
Construction Performance
Domestic
Oversea
E-PR Office
News
Brochure
Promotional video
C/S Center
Notice
Online Quotation & contact
ENG
ENG
KOR
JPN
VNM
CHN
Product
Construction Performance (Domestic)
Company
Technique Development
Construction Performance
E-PR Office
C/S Center
Construction Performance (Domestic)
01
Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
Started
2018.11.21
Completed
2020.03.01
Capacity
18.5T/HR
Pressure
Pressure 30kg/㎠
Location
Gwangju
02
Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
Started
2018.12.21
Completed
2019.12.17
Capacity
53.9T/HR
Pressure
1.4Mpa
Location
Sejong
03
Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
Started
2013.09
Completed
2014.01
Capacity
15,000Kg/HR
Pressure
20kg/㎠
Location
Pyeogtaek Poseung
04
Anytech (WASTE HEAT BOILER)
Started
2018.08.21
Completed
2019.10
Capacity
21.6T/H
Pressure
2.5Mpa
Location
Anytech factory in Yangju
납품실적(국내) 목록
CUSTOMER
YEAR
CAPACITY
(Kg/HR)
LOCATION
PRESSURE
TYPE
REMARK
SUNGLIM OIL & CHEMICAL
2016.02
5,000Kg/HR
ANSAN
12kg/㎠
HEAT EXCHANGER
CHODANG ENVIRONMENT
2016.02
16,700Kg/HR
JEONNAM
12kg/㎠
VACUUM CAPACITOR
3-DRUM
SKC INFRASERVICE
2016.02
100,000Kg/HR
ULSAN
44kg/㎠
SEPERATOR
SE HA CORP
2016.01
25,000Kg/HR
HYEONPUNG
10kg/㎠
WATER TUBE BOILER
WATER TUBE REPLACEMENT
MH ETHANOL
2016.01
18,000Kg/HR
MASAN
30kg/㎠
WATER TUBE BOILER
WOOLIM INDUSTRY
2016.01
6,000Kg/HR
YEOJU
HEAT SUPPY BOILER
BIOMASS
KGETS
2015.11
20,000Kg/HR
SIWHA
20kg/㎠
WATER TUBE BOILER
WATER TUBE REPLACEMENT
MONALISA
2015.11
20,000Kg/HR
JEONJU
20kg/㎠
ECONOMIZER
CDS ENERGY(posco)
2015.10
15,000Kg/HR
KOREA
47kg/㎠
WASTE HEAT
2-DRUM
SUNWOOD
2015.07
15,000Kg/HR
INCHEON
16kg/㎠
WOOD BOILER
DONGWOO BIO
2015.08
5,000
YONGIN
10kg/㎠
WOOD PELLET BOILER
ASIA PAPER
2015.07
45,000Kg/HR
SIHWA
20kg/㎠
CAVITY
WATER TUBE REPLACEMENT
KITECH
2015.07
1,500Kg/HR
JEONJU
10kg/㎠
STEAM BOILER
NEOGREEN TECH
2015.06
3,500Kg/HR
DUNPO
7kg/㎠
WOOD BOILER
NATURE & PEOPLE
2015.06
10,000Kg/HR
DAMYANG
14kg/㎠
SMOLE TUBE BOILER
처음
1
페이지
2
페이지
3
페이지
4
페이지
5
페이지
열린
6
페이지
7
페이지
8
페이지
9
페이지
10
페이지
다음
맨끝
게시물 검색
검색대상
CUSTOMER
YEAR
검색어
필수
검색
검색