Company
Greetings
History
Vision
Introduction to technicians
Certification and patents
Facility·equipment status
Introduction to Branches
Technique Development
Low temperature pyrolysis
Cyclonic Combustor (Cyclone)
Water Tube Boiler
Constructing Boiler
Waste Heat Boiler (Incineration Boilor)
Wood Chip Boiler
Pellet Boiler
NHH-High Temperature Water Boiler
Gas Combustion Boiler
Combined Heat and Power boiler
Deaerator
Steam accumulator
Heat Recovery System
Construction Performance
Domestic
Oversea
E-PR Office
News
Brochure
Promotional video
C/S Center
Notice
Online Quotation & contact
ENG
ENG
KOR
JPN
VNM
CHN
Product
Construction Performance (Domestic)
Company
Technique Development
Construction Performance
E-PR Office
C/S Center
Construction Performance (Domestic)
01
Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
Started
2018.11.21
Completed
2020.03.01
Capacity
18.5T/HR
Pressure
Pressure 30kg/㎠
Location
Gwangju
02
Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
Started
2018.12.21
Completed
2019.12.17
Capacity
53.9T/HR
Pressure
1.4Mpa
Location
Sejong
03
Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
Started
2013.09
Completed
2014.01
Capacity
15,000Kg/HR
Pressure
20kg/㎠
Location
Pyeogtaek Poseung
04
Anytech (WASTE HEAT BOILER)
Started
2018.08.21
Completed
2019.10
Capacity
21.6T/H
Pressure
2.5Mpa
Location
Anytech factory in Yangju
납품실적(국내) 목록
CUSTOMER
YEAR
CAPACITY
(Kg/HR)
LOCATION
PRESSURE
TYPE
REMARK
DONGWHA
2016.06
-
ASAN
-
ECONOMIZER
DONGSUH FOOD
2016.06
10,000Kg/HR
CHANGWON
20kg/㎠
SPENT BOILER
DONGSUH FOOD
2016.06
15,000Kg/HR
CHANGWON
20kg/㎠
GAS BOILER
WATER TUBE REPLACEMENT
SUNWOOD
2016.06
25,000Kg/HR
INCHEON
25kg/㎠
WOOD BOILER
WATER TUBE REPLACEMENT
SHIN DAE YANG PAPER
2016.05
-
SIHWA
-
CAVITY
WATER TUBE REPLACEMENT
HWASUNG INDUSTRIAL MACHINERY
2016.05
6,000Kg/HR
HWASEONG
14kg/㎠
SMOKE TUBE BOILER
SUNGLIM OIL & CHEMICAL
2016.05
40,000Kg/HR
SIHWA
-
WASTE HEAT BOILER
CHODANG ENVIRONMENT
2016.04
56,000Kg/HR
JEONNAM
7kg/㎠
CYLINDRICALITY
CONDENSATE TANK
SUNGLIM OIL & CHEMICAL
2016.04
50,000Kg/HR
SIHWA
12kg/㎠
WASTE HEAT BOILER
DAELIM PAPER
2016.04
27,000Kg/HR
OSAN
14kg/㎠
WATER TUBE BOILER
3-DRUM
CHODANG ENVIRONMENT
2016.04
16,000Kg/HR
JEONNAM
10kg/㎠
VACUUM CAPACITOR
YOOWON
2016.04
7,000Kg/HR
GUMI
25kg/㎠
WATER TUBE BOILER
SUNGLIM OIL & CHEMICAL
2016.03
-
ANSAN
12kg/㎠
HEAT EXCHANGER
SE HA CORP
2016.03
25,000Kg/HR
HYEONPUNG
16kg/㎠
WATER TUBE BOILER
WATER TUBE REPLACEMENT
DAEGYEONG ESCO
2016.03
2,500Kg/HR
JANGSOO
10kg/㎠
INCINERATE BOILER
3-DRUM
처음
1
페이지
2
페이지
3
페이지
4
페이지
열린
5
페이지
6
페이지
7
페이지
8
페이지
9
페이지
10
페이지
다음
맨끝
게시물 검색
검색대상
CUSTOMER
YEAR
검색어
필수
검색
검색