Construction Performance (Domestic)
  • 01
    Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
    • Started2018.11.21
    • Completed2020.03.01
    • Capacity18.5T/HR
    • PressurePressure 30kg/㎠
    • LocationGwangju
  • 02
    Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
    • Started2018.12.21
    • Completed2019.12.17
    • Capacity53.9T/HR
    • Pressure1.4Mpa
    • LocationSejong
  • 03
    Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
    • Started2013.09
    • Completed2014.01
    • Capacity15,000Kg/HR
    • Pressure20kg/㎠
    • LocationPyeogtaek Poseung
  • 04
    Anytech (WASTE HEAT BOILER)
    • Started2018.08.21
    • Completed2019.10
    • Capacity21.6T/H
    • Pressure2.5Mpa
    • LocationAnytech factory in Yangju
납품실적(국내) 목록
CUSTOMER YEAR CAPACITY (Kg/HR) LOCATION PRESSURE TYPE REMARK
TAEJONG 2017.02 - SIHWA 10kg/㎠ CAVITY WATER TUBE REPLACEMENT
SHIN DAE YANG PAPER 2017.02 1,900Kg/HR SIHWA 10kg/㎠ SMOLE TUBE BOILER
WOLJA PAPER 2016.12 - JEJU - CAVITY
SOLUX 2016.12 15,000Kg/HR POCHEON 20kg/㎠ WASTE HEAT BOILER
ANOTHEN GEUMSAN 2016.11 - GEUMSAN - GAS DUCT
ANOTHEN GEUMSAN 2016.11 25,000Kg/HR GEUMSAN 30kg/㎠ WATER TUBE BOILER
KGETS 2016.11 - SIHEUNG - COOLING TOWER CASING REPLACEMENT
KWANGWON LUMBER 2016.11 15,000Kg/HR PYEONGTAEK - WOOD BOILER TUBE REPLACEMENT
KOAIRONE 2016.10 - DAEJEON - PIPING COOLER
ASIA PAPER 2016.09 60,000Kg/HR SEJONG 12kg/㎠ WATER TUBE BOILER WATER TUBE REPLACEMENT
KEST 2016.09 - GYEONGJU - HEAT EXCHANGER
POSCOICT 2016.08 6,000Kg/HR JEONGEUP 13kg/㎠ WASTE HEAT Biomass package
SHIN DAE YANG PAPER 2016.08 - SIWHA 10kg/㎠ CAVITY WATER TUBE REPLACEMENT
HITE JINRO 2016.07 70,000Kg/HR JEONJU - CHIMNEY
ECONOMIZER 2016.07 40,000Kg/HR CHEONGWON 14kg/㎠ WASTE HEAT BOILER 3-DRUM