Company
Greetings
History
Vision
Introduction to technicians
Certification and patents
Facility·equipment status
Introduction to Branches
Technique Development
Low temperature pyrolysis
Cyclonic Combustor (Cyclone)
Water Tube Boiler
Constructing Boiler
Waste Heat Boiler (Incineration Boilor)
Wood Chip Boiler
Pellet Boiler
NHH-High Temperature Water Boiler
Gas Combustion Boiler
Combined Heat and Power boiler
Deaerator
Steam accumulator
Heat Recovery System
Construction Performance
Domestic
Oversea
E-PR Office
News
Brochure
Promotional video
C/S Center
Notice
Online Quotation & contact
ENG
ENG
KOR
JPN
VNM
CHN
Product
Construction Performance (Domestic)
Company
Technique Development
Construction Performance
E-PR Office
C/S Center
Construction Performance (Domestic)
01
Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
Started
2018.11.21
Completed
2020.03.01
Capacity
18.5T/HR
Pressure
Pressure 30kg/㎠
Location
Gwangju
02
Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
Started
2018.12.21
Completed
2019.12.17
Capacity
53.9T/HR
Pressure
1.4Mpa
Location
Sejong
03
Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
Started
2013.09
Completed
2014.01
Capacity
15,000Kg/HR
Pressure
20kg/㎠
Location
Pyeogtaek Poseung
04
Anytech (WASTE HEAT BOILER)
Started
2018.08.21
Completed
2019.10
Capacity
21.6T/H
Pressure
2.5Mpa
Location
Anytech factory in Yangju
납품실적(국내) 목록
CUSTOMER
YEAR
CAPACITY
(Kg/HR)
LOCATION
PRESSURE
TYPE
REMARK
TAEJONG
2017.02
-
SIHWA
10kg/㎠
CAVITY
WATER TUBE REPLACEMENT
SHIN DAE YANG PAPER
2017.02
1,900Kg/HR
SIHWA
10kg/㎠
SMOLE TUBE BOILER
WOLJA PAPER
2016.12
-
JEJU
-
CAVITY
SOLUX
2016.12
15,000Kg/HR
POCHEON
20kg/㎠
WASTE HEAT BOILER
ANOTHEN GEUMSAN
2016.11
-
GEUMSAN
-
GAS DUCT
ANOTHEN GEUMSAN
2016.11
25,000Kg/HR
GEUMSAN
30kg/㎠
WATER TUBE BOILER
KGETS
2016.11
-
SIHEUNG
-
COOLING TOWER
CASING REPLACEMENT
KWANGWON LUMBER
2016.11
15,000Kg/HR
PYEONGTAEK
-
WOOD BOILER
TUBE REPLACEMENT
KOAIRONE
2016.10
-
DAEJEON
-
PIPING COOLER
ASIA PAPER
2016.09
60,000Kg/HR
SEJONG
12kg/㎠
WATER TUBE BOILER
WATER TUBE REPLACEMENT
KEST
2016.09
-
GYEONGJU
-
HEAT EXCHANGER
POSCOICT
2016.08
6,000Kg/HR
JEONGEUP
13kg/㎠
WASTE HEAT
Biomass package
SHIN DAE YANG PAPER
2016.08
-
SIWHA
10kg/㎠
CAVITY
WATER TUBE REPLACEMENT
HITE JINRO
2016.07
70,000Kg/HR
JEONJU
-
CHIMNEY
ECONOMIZER
2016.07
40,000Kg/HR
CHEONGWON
14kg/㎠
WASTE HEAT BOILER
3-DRUM
처음
1
페이지
2
페이지
3
페이지
열린
4
페이지
5
페이지
6
페이지
7
페이지
8
페이지
9
페이지
10
페이지
다음
맨끝
게시물 검색
검색대상
CUSTOMER
YEAR
검색어
필수
검색
검색