ENG
Product
Construction Performance (Domestic)
  • 01
    Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
    • Started2018.11.21
    • Completed2020.03.01
    • Capacity18.5T/HR
    • PressurePressure 30kg/㎠
    • LocationGwangju
  • 02
    Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
    • Started2018.12.21
    • Completed2019.12.17
    • Capacity53.9T/HR
    • Pressure1.4Mpa
    • LocationSejong
  • 03
    Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
    • Started2013.09
    • Completed2014.01
    • Capacity15,000Kg/HR
    • Pressure20kg/㎠
    • LocationPyeogtaek Poseung
  • 04
    Anytech (WASTE HEAT BOILER)
    • Started2018.08.21
    • Completed2019.10
    • Capacity21.6T/H
    • Pressure2.5Mpa
    • LocationAnytech factory in Yangju
납품실적(국내) 목록
CUSTOMER YEAR CAPACITY (Kg/HR) LOCATION PRESSURE TYPE REMARK
POONGSAN 2019.04 - BUSAN - Pickling Line Entry & Exit Coil Car
KEST 2019.04 5,000Kg/HR CHANGWON - ECONOMIZER
EZMEDICOM (SEOUL NATIONAL UNIVERSITY HOSPITAL) 2019.04 3,000 SEOUL - STEAM GAS BOILER
MICRO-ONE 2019.02 - SEOSAN - SRF BOILER SIDE TUBE REPLACEMENT
Korea Engineering Consultants Corp (MYEONG SEONG ENVIRONMENT) 2018.12 18,500Kg/HR KWANGJU 40kg/㎠(350℃) WASTE HEAT BOILER 3-DRUM (3.0MW POWER PLANT)
TAEJONG (ASIA PAPER) 2018.12 50,000 SEJONG 14kg/㎠ WASTE HEAT BOILER
WOOJIN & B TEC 2018.09 18,000Kg/HR KWANGJU 40kg/㎠ WASTE HEAT BOILER 3-DRUM
ANYTECH 2018.08 21,600Kg/HR GEUMSAN 25kg/㎠(320℃) WATER TUBE BOILER WATER TUBE REPLACEMENT
ANOTHEN GEUMSAN 2018.08 25,000Kg/HR GEUMSAN - WATER TUBE BOILER WATER TUBE REPLACEMENT
ECO & SERVICE 2018.07 20,000Kg/HR INCHUN - RPF COMBUSTER
CHODANG ENVIRONMENT 2018.07 16,000Kg/HR KWANGJU 12kg/㎠ MSW 2MW
MICRO-ONE 2018.01 30,000 SEOSAN 14kg/㎠ STOCKR SRF
POSCO 2018.01 500Kg/HR GWANGYANG - CYCLONE COMBUSTER 200TON/DAY SRF
WOOLIM-INDUSTRY 2017.12 - YEOJU - STOKER WOOD CHIP
MICRO-ONE 2017.10 - CHEONAN 7kg/㎠ WASTE HEAT BOILER