ENG
Product
Construction Performance (Domestic)
  • 01
    Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
    • Started2018.11.21
    • Completed2020.03.01
    • Capacity18.5T/HR
    • PressurePressure 30kg/㎠
    • LocationGwangju
  • 02
    Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
    • Started2018.12.21
    • Completed2019.12.17
    • Capacity53.9T/HR
    • Pressure1.4Mpa
    • LocationSejong
  • 03
    Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
    • Started2013.09
    • Completed2014.01
    • Capacity15,000Kg/HR
    • Pressure20kg/㎠
    • LocationPyeogtaek Poseung
  • 04
    Anytech (WASTE HEAT BOILER)
    • Started2018.08.21
    • Completed2019.10
    • Capacity21.6T/H
    • Pressure2.5Mpa
    • LocationAnytech factory in Yangju
납품실적(국내) 목록
CUSTOMER YEAR CAPACITY (Kg/HR) LOCATION PRESSURE TYPE REMARK
DAIHAN EUNPAKGY 2001.04 5,000Kg/HR ASAN 10㎏/㎠ SMOKE TUBE BOILER
SHIN DAE YANG PAPER 2001.02 1,900 SIHWA 10kg/㎠ SMOLE TUBE BOILER