Company
Greetings
History
Vision
Introduction to technicians
Certification and patents
Facility·equipment status
Introduction to Branches
Technique Development
Low temperature pyrolysis
Cyclonic Combustor (Cyclone)
Water Tube Boiler
Constructing Boiler
Waste Heat Boiler (Incineration Boilor)
Wood Chip Boiler
Pellet Boiler
NHH-High Temperature Water Boiler
Gas Combustion Boiler
Combined Heat and Power boiler
Deaerator
Steam accumulator
Heat Recovery System
Construction Performance
Domestic
Oversea
E-PR Office
News
Brochure
Promotional video
C/S Center
Notice
Online Quotation & contact
ENG
ENG
KOR
JPN
VNM
CHN
Product
Construction Performance (Domestic)
Company
Technique Development
Construction Performance
E-PR Office
C/S Center
Construction Performance (Domestic)
01
Myeongsung Environmental Co., Ltd. (Heat Recovery Boiler)
Started
2018.11.21
Completed
2020.03.01
Capacity
18.5T/HR
Pressure
Pressure 30kg/㎠
Location
Gwangju
02
Asia Paper MFG Co., Ltd.(Heat Recovery Water Tube Boiler, Asia Paper Sejong 1st)
Started
2018.12.21
Completed
2019.12.17
Capacity
53.9T/HR
Pressure
1.4Mpa
Location
Sejong
03
Kwangwon Lumber (Water Tube Boiler, WOODINCENERATION)
Started
2013.09
Completed
2014.01
Capacity
15,000Kg/HR
Pressure
20kg/㎠
Location
Pyeogtaek Poseung
04
Anytech (WASTE HEAT BOILER)
Started
2018.08.21
Completed
2019.10
Capacity
21.6T/H
Pressure
2.5Mpa
Location
Anytech factory in Yangju
납품실적(국내) 목록
CUSTOMER
YEAR
CAPACITY
(Kg/HR)
LOCATION
PRESSURE
TYPE
REMARK
DAE YANG PAPER
2006. 03
25,000Kg/HR
SIWHA
20㎏/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
3-DRUM
SHIN DAE YANG PAPER
2005. 10
17,600Kg/HR
SIWHA
20㎏/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
TUBE REVAMPING
B Y C
2005. 10
20,000Kg/HR
JEONJU
10㎏/㎠
WATER TUBE BOILER
TUBE REVAMPING
DONGSUH FOOD
2005.04
15,000Kg/HR
CHANGWON
20㎏/㎠
WATER TUBE BOILER
HANKUK CONCREATE
2004. 09
5,000Kg/HR
GOKSUNG
10㎏/㎠
SMOKE TUBE BOILER
SELIM PAPER
2004. 04
45,000Kg/HR
HYENPUNG
16㎏/㎠
WATER TUBE BOILER
TUBE REVAMPING
DONGSUH FOOD
2004.03
10,000Kg/HR
CHANGWON
20㎏/㎠
WATER TUBE BOILER (COFFE BARK INCINERATION)
2-DRUM
DONGSUH FOOD
2004.04
15,000Kg/HR
INCHEON
20㎏/㎠
WATER TUBE BOILER
DONGSUH FOOD
2003.04
10,000Kg/HR
CHANGWON
20㎏/㎠
WATER TUBE BOILER
SELIM PAPER
2002. 10
15,000Kg/HR
HYENPUNG
16㎏/㎠
WATER TUBE BOILER (WASTE HEAT BOILER)
3-DRUM
DAIHAN EUNPAKGY
2001. 04
10,000Kg/HR
ANSAN
10㎏/㎠
SMOKE TUBE BOILER
DAIHAN EUNPAKGY
2001. 10
3,000Kg/HR
osan
10㎏/㎠
SMOKE TUBE BOILER
DAIHAN EUNPAKGY
2001. 06
7,000Kg/HR
Giheung
10㎏/㎠
SMOKE TUBE BOILER
DONGSUH FOOD
2001.05
1,000Kg/HR
CHANGWON
10㎏/㎠
WATER TUBE BOILER
DAIHAN EUNPAKGY
2001.05
6,000Kg/HR
ASAN
10㎏/㎠
SMOKE TUBE BOILER
처음
이전
열린
11
페이지
12
페이지
맨끝
게시물 검색
검색대상
CUSTOMER
YEAR
검색어
필수
검색
검색